See specificationSteel frame houses
A light steel frame is a set of cold bridges with a house around it. The envelope is only as good as the cavities you actually filled.
What goes wrong on site
Cavities behind the boards stay empty where a gun cannot reach.
Whole-envelope air-tightness is the test that fails first.
The schedule is tight and the trades are stacked on top of each other.
Why one-component foam, and not something else
How it is done, and what to hold
| Step | What to hold |
|---|---|
| Surface | Cavity clear of offcuts and dust, service penetrations identified and sleeved. |
| Fill volume | One third of the joint depth. The foam expands to fill; filling it to the top bends frames and wastes material. |
| Passes | Two passes of 30 mm at most. A single thick pass traps heat and collapses in the core. |
| Trim | Cut after the window on the parameter card. Never pull or press uncured foam. |
| Cover | PU is not UV-stable. Any exposed face gets sealant, render or a trim within 48 hours. |
Typical guidance. The parameter card for your grade carries the tolerances your operators work to.
Common failures
Component A for the primary air barrier; Component C for cavity filling where the decision is cost per bay.
See specificationWhat to tell your customer
„We fill the cavity before the boards go on, not after.“
„Every service penetration is sleeved and sealed separately.“
„The air barrier is continuous — the blower-door result depends on that line.“
Send the drawing or the photo — we will reply with the parameters.